First picture PreviousLatest Entry Next Last picture
Click to Enlarge

The landing gear is being held in the proper position by strapping it to scrap lumber that has been bolted into the concrete floor.Also notice that the cowl has been removed and you can see the lower flange for the cowl. Another flange will be made on the top fuselage after it has been installed.

3/1/2013   Picture 30

** Click picture for large version