First picture PreviousLatest Entry Next Last picture
Click to Enlarge

Since the fitting was done I started to install the bulkheads permanently by laying in glass. The manual calls for the bulkheads first so I started with #1 and #8 which form the backside of the fuel tank. I needed to clean out the form core all around the pieces and fill three sides with Micro Slurry followed by two layers of BID covered with peel ply.I have only done one side as I wanted to leave the wooden blocks in place on the back side to hold the pieces straight. I will be able to knock them out and fibreglass the back side next time I�m in the hangar.

5/15/2013   Picture 331

** Click picture for large version