An easier day today as all I wanted to get done was one side of the remaining two bulkheads #2 & #3. I ran one continuous piece of glass all along the bottom right inside the fuselage. I also cut out the fuselage opening to the finished height of the top strake and glassed #2 to the inside of the fuselage. |