First picture PreviousLatest Entry Next Last picture
Click to Enlarge

Next came the measurement for placing the elevator hinges which I took great care to get as accurate as possible. I have both elevators marked out and the hinges placed with a string running the length to make sure all are lined up. It�s a good thing I drink coffee as the K-Cups fit the elevator tube just nicely and hold the string very tight. Now I just need to purchase a #30 drill bit, a 4� piece of dowel and an ignition wrench to finish the job.

8/27/2014   Picture 463

** Click picture for large version